Post by Iron Webbo on May 13, 2009 16:52:34 GMT
It's that time of year again folks! and our intrepid groundsman and I have drawn up a cunning plan to get the following done before the first home friendly in July. Can any of you lend a hand? It would be nice to see the youth, reserves and ladies helping with the dressing room work - volunteers Tom, Mark, Dave, etc.?
I see work parties starting at about 10.30 on Saturdays, until I get the beers in.
The list is as follows:
HOME DRESSING ROOM 1. New dressing room door 2. Make repairs to wall backing on to shower area 3. New tap in sink in shower 4. New shower bracket 5. Remove washing machine and dryer (to new gym & kit room) 6. Decorate AWAY DRESSING ROOM 1. 2 new shower heads 2. Decorate REFS ROOM 1. 2 new coat hooks SPORTSMAN STAND 1. Replace (where necessary) and paint facias 2. Re-affix apex roofing sheets under tv gantry 3. Re-fix guttering and downpipe 4. Repair wiring in the tannoy hut, test and make good DUG-OUTS 1. Repair seating in and paint both dugouts MAIN STAND 1. Check seating and re-fix any lose seats 2. Paint press box writing areas (rust proof gloss paint) GROUND
Coat of creosote on programme hut and fence leading to wooden exit gate Reposition bolt claspes on wooden exit gate New light fittings and redecorate outside toilets Reaffix Chain Link Fencing On Training Pitch Tidy Up Car Park Prepare old boardroom/T-Bar to become new gym & kit room
If you've got any suggestions or additions, add to this thread and I'll keep the list up to date on here throughout the summer.
|
|
|
Post by dav on May 14, 2009 13:48:52 GMT
Can I opt not to paint the dressing rooms or dugouts this year please ) Will speak to the girls as well!!
|
|
|
Post by castIRONgooner on May 15, 2009 9:20:00 GMT
looking forward to it mr chairman
|
|
|
Post by chris on May 15, 2009 11:21:47 GMT
Yea im up for it
|
|
|
Post by Iron Webbo on Jun 1, 2009 12:23:49 GMT
Work party this Saturday, 6th June, starting at 11(ish!)
Can you let me know who is able to attend?
|
|
tik
On the bench
Posts: 154
|
Post by tik on Jun 1, 2009 21:06:59 GMT
i will be there paintbrush in hand and looking forward to a game of boule after we finish with a pint or three
|
|
|
Post by ashonthepa on Jun 2, 2009 19:58:10 GMT
Whilst I am unable to attend just a little suggestion - will it at all be possible to relocate tannoy wiring and area to main stand Alternatively arrange for the hideous now not used DVD SCAFFOLDING TO BE REMOVED - THANKS AND JUST A WEE SUGGESTION..........
|
|
Jim
Regular reserve teamer
Posts: 95
|
Post by Jim on Jun 4, 2009 14:06:12 GMT
I should be there, as usual
|
|
|
Post by Iron Webbo on Jun 8, 2009 18:34:25 GMT
PROGRESS REPORT FROM Saturday, 6 June
The list is as follows:
HOME DRESSING ROOM
1. New dressing room door 2. Make repairs to wall backing on to shower area 3. New tap in sink in shower 4. New shower bracket 5. Remove washing machine and dryer (to new gym & kit room) - awaiting new gym/kit room to be ready 6. Decorate - done
AWAY DRESSING ROOM
1. 2 new shower heads 2. Decorate - done
REFS ROOM 1. 2 new coat hooks
SPORTSMAN STAND
1. Replace (where necessary) and paint facias 2. Re-affix apex roofing sheets under tv gantry 3. Re-fix guttering and downpipe 4. Repair wiring in the tannoy hut, test and make good
DUG-OUTS
1. Repair seating in and paint both dugouts 2. apply coat of paint to brickwork
MAIN STAND
1. Check seating and re-fix any lose seats 2. Paint press box writing areas (rust proof gloss paint)
GROUND
1. Coat of creosote on programme hut and fence leading to wooden exit gate 2. Reposition bolt claspes on wooden exit gate 3. New light fittings and redecorate outside toilets 4. Reaffix Chain Link Fencing On Training Pitch 5. Tidy Up Car Park 6. Prepare old boardroom/T-Bar to become new gym & kit room - work underway
Well done and thanks to Saturday's helpers - work starts this Saturday at 11am.
tik - can you be 'officer in charge' this Saturday as I'm attending the league AGM - I'll leave beer money with Chrissie. I'll be back on the 20th.
|
|
|
Post by dav on Jun 9, 2009 14:21:44 GMT
Makes you realise how much there is to be done given that despite the few of us who were there last Saturday working away we still have only got started on 4 of the 23 things on the list. Admittedly some of those were quite time consuming but it goes to prove how desperately we need more hands to help out this Saturday!
|
|
tik
On the bench
Posts: 154
|
Post by tik on Jun 9, 2009 14:57:02 GMT
wot leave me in charge o folly folly
|
|
|
Post by castIRONgooner on Jun 9, 2009 20:24:23 GMT
i'll make my usually appearence have a coffee and piss off to play silly bat and ball games
|
|
|
Post by dav on Jun 13, 2009 17:20:44 GMT
Well done to today's volunteers - the list is getting gradually smaller so any help next Saturday would be massively appreciated - especially from Mr Hopkinson HOME DRESSING ROOM 1. New dressing room door 2. Make repairs to wall backing on to shower area 3. New tap in sink in shower 4. New shower bracket 5. Remove washing machine and dryer (to new gym & kit room) - awaiting new gym/kit room to be ready6. Decorate - doneAWAY DRESSING ROOM 1. 2 new shower heads 2. Decorate - doneREFS ROOM 1. 2 new coat hooks SPORTSMAN STAND 1. Replace (where necessary) and paint facias 2. Re-affix apex roofing sheets under tv gantry - done3. Re-fix guttering and downpipe 4. Repair wiring in the tannoy hut, test and make good DUG-OUTS 1. Repair seating in and paint both dugouts - work underway2. apply coat of paint to brickwork - doneMAIN STAND 1. Check seating and re-fix any lose seats 2. Paint press box writing areas (rust proof gloss paint) GROUND 1. Coat of creosote on programme hut and fence leading to wooden exit gate 2. Reposition bolt claspes on wooden exit gate 3. New light fittings and redecorate outside toilets 4. Reaffix Chain Link Fencing On Training Pitch 5. Tidy Up Car Park 6. Prepare old boardroom/T-Bar to become new gym & kit room - work underway
|
|
|
Post by castIRONgooner on Jun 14, 2009 12:00:50 GMT
Cheers Dave, i might not be available next weekend, i need iron in my bloods lady friend to drop there sprog so that i can replace him on nights for his pertenity for me to be available.
|
|
|
Post by Iron Webbo on Jun 26, 2009 9:43:04 GMT
My thanks to all who have kept the momentum going while I've been in Spain. I'll be back tomorrow (Saturday, 27th June) starting at 11am and we need to push on. We'll be joined by Robbie Garvey who will be sorting out his new office and available for a chat. The usual food and beer arrangements will apply. HOME DRESSING ROOM 1. New dressing room door - done2. Make repairs to wall backing on to shower area - done3. New tap in sink in shower 4. New shower bracket 5. Remove washing machine and dryer (to new gym & kit room) - awaiting new gym/kit room to be ready6. Decorate - doneAWAY DRESSING ROOM 1. 2 new shower heads 2. Decorate - doneREFS ROOM 1. 2 new coat hooks SPORTSMAN STAND 1. Replace (where necessary) and paint facias 2. Re-affix apex roofing sheets under tv gantry - seems to have sliped again3. Re-fix guttering and downpipe 4. Repair wiring in the tannoy hut, test and make good DUG-OUTS 1. Repair seating in and paint both dugouts - still to repair seating2. apply coat of paint to brickwork - doneMAIN STAND 1. Check seating and re-fix any lose seats 2. Paint press box writing areas (rust proof gloss paint) - doneGROUND 1. Coat of creosote on programme hut and fence leading to wooden exit gate 2. Reposition bolt claspes on wooden exit gate 3. New light fittings and redecorate outside toilets 4. Reaffix Chain Link Fencing On Training Pitch 5. Tidy Up Car Park 6. Prepare old boardroom/T-Bar to become new gym & kit room - work underway
|
|